Abstract

<p><span lang="EN-US">This article consists of studying the reliability of the Moroccan electricity grid as well as verifying the plan of production for 2030. To propose an adequate production plan for 2050, a production plan where renewable energies take a large place in the production park. Our objective is the planning and optimization of the Moroccan energy system with a strong integration of renewable energy sources or even 100% integration by guaranteeing the reliability of the electrical system. In this study, we evaluated the reliability of the Moroccan electricity grid in the presence of renewable electricity production based on the energy plan simulator supplemented by Monte Carlo simulations based on probabilistic approaches. The first part of this work consists of projecting demand for 2030-2050 and studying the impact of energy efficiency on forecasts. In the second part, we integrated the existing means of production and the projected demand on energy plan. In the third part we studied the reliability of the Moroccan electricity grid in the presence of the production of wind, solar photovoltaic (PV) and concentrated solar (CSP) electricity according to different stages of study (from 2017 to 2050).</span></p>

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.