Abstract

In this paper an isolated two area restructured power system with thermal-thermal non reheat unit has been considered with and without wind power connectivity for the visualization of grid frequency fluctuations. All the generators are considered working under automatic generation control mode under the bilateral market to meet the load demand. Results for the local load variation of 20% with and without wind power fluctuations are represented. It has been observed that the peak overshoots and settling time for the frequency is more during the wind power connectivity with grid. From the literature it is realized that battery energy storage (BES) or electrical vehicle (EV) is the best technology to overcome this problem.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.