Abstract

This paper focuses on market design options for operational balancing management in self-dispatch electric power systems. In particular, it investigates the most relevant timing for the balancing gate closure, when competitors' decisions on the setting of controllable assets are neutralized and this responsibility is simultaneously transferred to the system operator. This discussion is central in the development and implementation of the European Electricity Balancing Guideline. Based on a multi-level simulation tool with a realistic modelling of short-term power system operations, this paper proposes the first quantitative assessment of postponing the balancing gate closure time from 1 h to 15 min ahead of the imbalance settlement period. For different environments (energy mix, power plant capabilities, outages, etc), the results highlight that postponing the balancing gate closure time from 1 h to 15 min increases the operational cost of the system. Based on robust and scalable results, we show that this difference is mainly due to a better coordination of the available resources by the central decision maker.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call