Abstract

PurposeThe purpose of this study is to explore the impact of asymmetric trust on construction project management performance in China's construction industry. Moreover, the authors explore the mediating role of two types of knowledge sharing (explicit knowledge sharing and tacit knowledge sharing) in explaining the association between asymmetric trust and project management performance.Design/methodology/approachA theoretical model based on the research hypotheses proposed in this study was developed and a questionnaire survey was conducted with 271 professionals. The data collected was analyzed by the structural equation modeling (SEM) technique.FindingsThe results of this study indicate that there is a significant and negative association between asymmetric trust and project management performance. Moreover, two types of knowledge sharing (explicit knowledge sharing and tacit knowledge sharing) have different degrees of impact on improving project management performance. In addition, tacit knowledge sharing is a mediator between asymmetric trust and project management performance.Research limitations/implicationsThe data used in this study is from Chinese scenarios, so the research conclusions and application effects based on this are bound to have certain regional limitations. Besides, there are many factors that affect project management performance improving, and the relationships among them are so complex. The theoretical model proposed in this study may not be fully considered. Therefore, follow-up researchers can consider bringing more suitable variables into their researches, so that the theoretical researches can be more in line with the actual project management practice, and the specific mechanism for improving project management performance can be explained more deeply.Originality/valueThis research's value is as follows: Firstly, this paper contributes to the trust and relational governance literature by expanding the research perspective of mutual trust to asymmetric trust. Specially, this research designs a measurement scale for asymmetric trust and then reveals the impact mechanism of it on project management performance, which will certainly promote research paradigm change of trust. Secondly, this research is beneficial to knowledge sharing literature in the construction management field by expanding the research scope of knowledge sharing from a cross-organizational perspective.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.