Abstract

The interaction of a double-tube parallel tunnel excavation will have a larger additional shearing action on the adjacent pipelines. This paper, taking 202 Section of Line 2 on Dalian Metro as the background, uses the finite difference software to establish 3-D finite element analysismodel to simulate the double-tube parallel tunnel excavation. Deformation of adjacent pipelines is analyzed specially by numerical simulation of tunnel excavation and also the safety of the pipelines is forecasted. The conclusions and advices are important to design and guide the actual project construction safety.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.