Abstract

Bracing of foundation pit design proposal based on the excavation near a block of Suzhou Rail Transit Line 1 is used to build a subway tunnel-pit-envelope three-dimensional computational model, which is analyzed by FLAC3D, software for numerical simulation analysis, to evaluate the impact of the foundation pit excavation on the deformation of the subway tunnel. The calculated results show that: when the pit is excavated to the bottom, the deformation of the tunnel achieves the maximum value, 0.6mm of y direction and 6.54mm of z direction. The pipelines with shallow depth are subject to the deformation caused by the soil subsidence back of the envelope, whose maximum value has reached 7.6mm beyond the control standards. In terms of the deformation of the subway tunnel structure, the deformation can meet the control requirements, and have a certain margin of safety.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.