Abstract
ABSTRACTThe sand compaction pile (SCP) method can be applied to soft marine clay ground that is a reinforcement of composite ground consisting of compacted sand piles and surrounding clay. The application of SCP method in the immersed tunnel of Hong Kong–Zhuhai–Macao Bridge verify SCP method is a robust solution to limit the total settlement and differential longitudinal settlement and to promote smooth transition from immersed tunnel to artificial island. The SCP method has significant settlement reduction effect on marine clay. The SCPs can also function as a drainage path to accelerate the consolidation process in marine clay. It is also found that the consolidation rate of SCP-improved ground is delayed compared with that predicted program which is most probably because of the soil disturbance effect during the installation of SCPs.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.