Abstract

Substation Automation System (SAS) based on IEC 61850 is becoming more and more reality in applying power systems. As well, the development of various engineering tools and the convergence with diagnostic systems are underway. To reflect recent advancements in SAS technology, the Korea Electric Power Corporation initiated a 154kV SAS pilot project and a smart power grid business in 2010. In this paper, the authors will summarize the overview and the lessons learned in applying the IEC 61850-based 154kV Main transformer bay IED solutions to these two project.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.