Abstract

Abstract The amount of waste generated in construction and demolition (C&D) processes is enormous. Therefore, many studies on efficient C&D waste minimization and management have been conducted. However, 21 process-related and 8 technology-related limitations in C&D waste management and minimization have not yet been resolved. Building information modeling (BIM) helps project participants improve the processes and technologies in the planning, design, construction, and demolition phases, thereby managing and minimizing C&D waste efficiently. Therefore, this paper identifies the potential opportunities of BIM for efficient C&D waste management and minimization, such as design review, 3D coordination, quantity take-off, phase planning, site utilization planning, construction system design, digital fabrication, and 3D control and planning. The BIM-based approaches can support C&D waste management and minimization processes and technologies by addressing existing limitations through in-depth literature review. The roles of project participants and information required for each BIM-based approach in C&D waste management and minimization are discussed with illustrative process maps.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call