Abstract

The activity-on-arrow (AOA) method can be used in construction projects depending on the project condition, although it is relatively inefficient as compared to the activity-on-node (AON) method. The most critical problem of the AOA method that is yet to be resolved is the application of a logical dummy activity (dummy). This paper presents a heuristic method that can be used for systematically identifying and applying logical dummies during the creation of an AOA network based on predefined activity dependencies. The heuristic method first identifies logical dummies of one-to-one relationships, and then detects the other multiple relationships in a stepwise manner to remove the redundancies therein.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.