Abstract

British Columbia Gas, a major utility, was required by the British Columbia Utilities Commission (BCUC) to develop an integrated resource plan that addressed multiple objectives and involved the participation of stakeholders. To assist BC Gas, we elicited values separately from most of the senior executives at BC Gas, members of the BCUC, and representatives of several stakeholder groups. Based on these values, we structured a set of objectives and associated performance measures for integrated resource planning (IRP) at BC Gas. A multistakeholder process then provided judgments about appropriate value tradeoffs among these objectives. This information was used in several ways in the IRP process. It fostered improved communication and served as a guide for designing more attractive plans and identifying future information needs. It also provided the basis for a quantitative evaluation of alternative plans and resources. Both the IRP process and the chosen integrated resource plan were reviewed by lawyers representing intervenors at a quasi-judicial hearing of the BCUC. Their concerns are informative in providing lessons for the use of the elicited values in the context of regulatory hearings.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.