Abstract
A major limitation of Life-Cycle Cost (LCC) estimation/prediction modelling is the current typical reliance only on those factors that can be readily quantified and come easily to hand. While estimation of the cost of the most common labor, material and plant resources receive consideration because of their high visibility factor, there are several non-cost factors (low visibility factors) affecting the estimate that are often overlooked and, it is argued here, require equal consideration in estimation processes that seek optimum accuracy. Unfortunately, such (low-visibility) factors are neglected or ignored by current prediction models. Identification of these non-cost factors (low visibility factors) affects LCC estimate accuracy and can improve estimation process confidence. This paper critically reviews secondary research on identification of these important non-cost factors and subsequently determines their influence on the accuracy level(s) of construction cost estimation.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Proceedings of International Structural Engineering and Construction
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.