Abstract

The design-build (DB) system has been demonstrated as an effective delivery method and has gained popularity worldwide. However it is observed that a number of operational variations of DB system have emerged since the last decade to cater for different client's requirements. After the client decides to procure his project through the DB system, he still has to choose an appropriate configuration to deliver their projects optimally. However, there is little research on the selection of DB operational variations. One of the main reasons for this is the lack of evaluation criteria for determining the appropriateness of each operational variation. To obtain such criteria, a three-round Delphi survey has been conducted with 20 construction experts in the People's Republic of China (PRC). Seven top selection criteria were identified. These are: (1) availability of competent design-builders; (2) client's capabilities; (3) project complexity; (4) client's control of project; (5) early commencement & short duration; (6) reduced responsibility or involvement; and (7) clearly defined end user's requirements. These selection criteria were found to have a statistically significant agreement. These findings may furnish various stakeholders, DB clients in particular, with better insight to understand and compare the different operational variations of the DB system. Santrauka Įrodyta, kad projektavimo ir statybos (P ir S) sistema – veiksmingas vykdymo metodas, tad ji išpopuliarėjo visame pasaulyje. Tačiau pastebėta, kad per pastarąjį dešimtmetį atsirado ne vienas darbinis P ir S sistemos variantas, tenkinantis skirtingus kliento poreikius. Klientui nutarus projekto paslaugas pirkti naudojant P ir S sistemą, jam vis tiek tenka pačiam pasirinkti tinkamą derinį, idant projektas vyktų optimaliai. Tačiau darbinių P ir S variantų pasirinkimas beveik nebuvo tyrinėtas. Viena pagrindinių priežasčių – trūksta vertinimo kriterijų, kurie leistų nustatyti kiekvieno darbinio varianto tinkamumą. Siekiant nustatyti tokius kriterijus, atliekant Delphi apklausą trimis etapais buvo apklausta 20 statybos ekspertų iš Kinijos Liaudies Respublikos (KLR). Nustatyti septyni svarbiausi atrankos kriterijai: 1) kompetentingų projektuotojų statytojų pasiūla; 2) kliento pajėgumai; 3) projekto sudėtingumas; 4) kiek klientas kontroliuoja projektą; 5) ankstyva pradžia ir nedidelė trukmė; 6) mažesnė atsakomybė arba dalyvavimas; 7) aiškiai nusakyti galutinio kliento reikalavimai. Nustatyta, kad susitarimas dėl šių atrankos kriterijų yra statistiškai reikšmingas. Įvairioms suinteresuotosioms grupėms, o ypač P ir S klientams, šios išvados gali padėti geriau suprasti įvairius darbinius P ir S sistemos variantus ir juos palyginti.

Highlights

  • Design-build (DB) is a delivery method where one entity or consortium is contractually responsible for both design and construction (Songer, Molenaar 1997)

  • This paper focuses on identifying the most important selection criteria for different DB operational variations in the People’s Republic of China (PRC)

  • The selection criteria identified in this study provide clients with perspectives to understand and examine different operational variations

Read more

Summary

Introduction

Design-build (DB) is a delivery method where one entity or consortium is contractually responsible for both design and construction (Songer, Molenaar 1997). Large amount of research on design-build, few, if any, systematic studies focus on the selection process of DB operational variations. The importance of selecting DB operational variations was emphasized, the Federal Highway Administration (2006) did not provide practical methods to determine the appropriate level of preliminary design in DB request for proposals. Findings of the current study will provide a solid base for future research to establish a decision model for selecting the best DB operational variation under a given set of circumstances. 3. Research methodology – the Delphi technique The Delphi method is designed to obtain the most reliable consensus of a group of experts by a series of intensive questionnaires interspersed with controlled opinion feedback, and with results of each round being fed into the round (Linstone, Turoff 1975; Chan et al 2001a). The experts’ sufficient working experience and sound knowledge of DB project management increase the validity of this Delphi research

Three rounds of Delphi questionnaires survey: results and analysis Round 1
15. Buildability of the construction
Discussion
Findings
Project Real estate manager developer
Conclusions
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.