Abstract
The enhancement of connectivity between the main corridors of the economy in South Sumatera, as a purpose of the StrategicPlan of Directorate General Bina Marga and also an objective of MP3EI, Master Plan for Acceleration and Expansion ofIndonesia's Economic Development which is an ambitious plan by the Indonesian government to accelerate the realization ofbecoming a developed country would be able to achieve on the requirement of good condition on performance and pavement. Inorder to support the optimal condition of the road, the identification of road management was conducted to determine thenecessity of road maintenance based on technical conditions and importance level of development of the road traversed. Themanagement program proposed is expected to be used as a baseline in determining the maintenance of the road network in SouthSumatera from 2015 until 2019. This research used Multi-criteria Analysis (MCA) method, which consists of: (1) road networkperformance, covering width of roadways, traffic flow, V/C ratio, travel speed and travel time of the vehicle, and (2) pavementcondition, with IRI, SDI, and the proportion of good pavement condition as a parameter. Multi-criteria analysis used combinedroad condition assessment score and importance level of development of the area traversed by. This analysis was conductedfrom 2015 until 2019. The research concluded that maintenance necessity in 2015 were dominated by routine maintenance(95.86% of the total length), then in 2016 until 2019 the needs were dominated by routine maintenance (near 100% of the totallength). As the maintenance applied, a vast amount of total road length fulfilled as an achievement target. The results arefollows: (a) 100% with width of roadways ≥ 7 meter, (b) 97.83% with V/C ratio < 0.75, (c) 18.50% with travel speed >60km/hour, (d) 17.32% with travel time (TT) < 1.6 jam/100km, (e) 100% with good pavement condition > 95%, (f) 90.37% withIRI < 4 m/Km, and (g) 91.59 with SDI < 50. Yet with the achievement of 100% of total road length with a minimum width 7.0meter, and 90.37% of total road length with an IRI less than 4.0 m/km in 2019, the impact was not significant on increasinglength of the road with a travel time (TT) less than 1.6 jam/100km. The condition is caused by there are no maintenancerequirements concerning the improvement of the substandard road geometric.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.