Abstract

Prefabricated building is the new construction method of technical reform and upgrading in China’s construction industry. The construction of prefabricated buildings involves the production, transportation and hoisting of large prefabricated components. Due to the difficulty in handling large prefabricated components, lacking of prefabricated building construction experience of workers, insufficient management guidelines for prefabricated building, there are a large number of hazard sources in the new production environment. This paper is to identify hazard sources relating to prefabricated components which exist in four stages of production, transportation, on-site storage, and installation. Firstly, we used the method of literature study to initially identify the hazard sources of prefabricated buildings; then, expert investigation was applied and Entropy Weight Method was used to evaluate the severity of hazard sources; finally, significant hazard sources at each stage were identified and countermeasures were put forward for the prevention of accidence. This study enriches the theoretical research on prefabricated building safety management and provides references for the prevention of prefabricated building safety risks.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.