Abstract
Identification of critical path on bituminous road transport network analysis is more complicated in the current period due to the involvement of multi-criteria: time, cost, safety, facilities etc. In this study, we propose multi-criteria decision making model to identify the critical path in road transport network using Integrated Fuzzy AHP – Fuzzy TOPSIS Method. For this reason, a number of criteria are defined by conducting survey from many international, national, state and village road ways. The major cause for adopting this integrated method is to yield effective optimum critical path among the possible paths between two nodes. The main purpose of taking this research is to provide effective methodology to the transport department and society to avoid the critical paths for their safe journey. Moreover, the methodology will be highly useful to the Ministry of Road Transport and Highways for making safer road ways in future. In order to show the effectiveness of the proposed methodology, a numerical example is given at the end of this research work.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.