Abstract

The Indian construction industry plays a imperative role in the national economy. In the recent past quite a lot of ambitious projects have been undertaken by central as well as the state governments. It is highly unfortunate that most of the proposed infrastructure projects are plagued by severe time overruns which have a propensity to escalate the costs involved and make the efforts futile. Any construction project can be divided into three main phases, i.e. project conception, project design and project construction or execution phase. It is observed that mainly the project delays occur during the construction or execution period, where many unforeseen factors are continually drawn in. This study therefore aims to recognize the critical factors responsible for schedule delays in construction projects in India. A questionnaire consisting of ten critical factors was formed and distributed to professionals engaged in construction projects across India. A total of eighty five respondents consisting 33 clients, 10 consultants and 42 contractors took part in the survey. The Mean Score was calculated for each of the factor considering various groups of respondents and subsequently ranking of the factors was carried out. Lack of human resources-skilled, semi-skilled and unskilled, poor site management and lack of coordination and control emerged as the top three factors.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.