Abstract
The current software crisis has created a situation where organizations are faced with identified as well as hidden information systems (IS) development backlogs. IS projects are generally behind schedule and/or over budget. Even after implementation, the IS does not necessarily solve all the original problems and is very difficult and costly to use and maintain. Software development and maintenance costs represent the major component of total information technology (IT) budget. Reports on research conducted in Singapore which addresses the question concerning the identification of the skills of systems analysts. Analyses this question from three different viewpoints (interviews about “excellent” systems analyst, newspaper advertisements for systems analyst positions, and a questionnaire regarding hiring, promotion, evaluation and training criteria for systems analysts). The research suggests that there is a discrepancy between the criteria established for the initial screening of candidates and the actual process followed for selection, evaluation, training and promotion of systems analysts. This discrepancy will result in the less than optimal use of systems analyst personnel and may be a contributing factor to the current IS software crisis. While the research was conducted solely in Singapore, it is contended that the results are generally applicable because of the emergence of what is referred to as an “occupational community” of systems analysts.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.