Abstract

This report documents a baseline criteria evaluation of the FAST Plant Protection System (PPS) at the Idaho Chemical Processing Plant (ICPP). Westinghouse Idaho Nuclear Company (WINCO), Computer Process Application (CPA) personnel originally prepared this report as requested by the FAST Fluorinel Dissolution Process (FDP) Operational Readiness Review (ORR) committee. It was required by the ORR committee for the 1992 restart of FDP operations. However on April 29, 1992, the Department of Energy (DOE) directed WINCO to discontinue reprocessing of spent nuclear fuel at the ICPP. This eliminated the mission of the FDP. The report includes an evaluation of the PPS against criteria requested by the ORR committee and against criteria contained in the WINCO PPS Requirements Manual. This second criteria evaluation is summarized in Appendix A.