Abstract

We describe an intelligent co-simulator for real time production control of a complex flexible manufacturing system (CFMS) having machine and tool flexibility. The manufacturing processes associated with the CFMS are complicated with each operation being possibly done by several machining centers. The co-simulator design approach is built upon the theory of dynamic meta-model based supervisory control with the cooperation of its own embedded intelligent blocks. The system is implemented by coupling of the centralized simulation controller (CSC) and real-time simulator for enforcing dynamic strategies of shop floor control. The posteriori adaptive co-simulator is equipped with a concurrent bilateral mechanism for simulation optimization based on appropriate control rules enhancing performance criteria simulation efficiency. A working intelligent adaptive controller prototype (iCoSim-FMS) has been developed to validate the proposed approach and compare its performance with well known FMS heuristic methods.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.