Abstract
The "Nuclear Safety Planning" has been published in Oct. 2012 in China, which stipulates the safety goals for the NPPs which will be built in the future. As for the nuclear power plants (NPPs) which will be built in China's Thirteenth Five-Year (2016-2020) and later, the high level safety goal is described as that "the possibility of the large radioactive release should be practically eliminated by design". A thorough investigation has been performed at SNERDI to explore the technical insight of this high level safety goal by using Multinational Design Evaluation Project (MDEP) hierarchical safety goal approach. The definition of large release is proposed accordingly, DID requirements and probabilistic requirements are derived from this high level safety goal.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: The Proceedings of the International Conference on Nuclear Engineering (ICONE)
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.