Abstract

The ice bridges described in this article are constructed annually to replace the ferries which operate during the summer on the Yukon, Pelly and Stewart rivers in Yukon Territory. These river crossings are on the Mayo Road connecting Dawson City and Mayo with the Alaska Highway. The traffic on the road consists largely of heavy trucks carrying mining ores from the United Keno Hill, and other mines.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call