Abstract

This paper presents a new approach based on Benders decomposition (BD) to solve hydrothermal unit commitment problem with AC power flow and security constraints. The proposed method decomposes the problem into a master problem and two sets of sub-problems. The master problem applies integer programming method to solve unit commitment (UC) while the sub-problems apply nonlinear programming solution method to determine economic dispatch for each time period. If one sub-problem of the first set becomes infeasible, the corresponding sub-problem of the second set is called. Moreover, strong Benders cuts are proposed that reduce the number of iterations and CPU time of the Benders decomposition method. All constraints of the hydrothermal unit commitment problem can be completely satisfied with zero penalty terms by the proposed solution method. The methodology is tested on the 9-bus and IEEE 118-bus test systems. The obtained results confirm the validity of the developed approach.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.