Abstract
The purpose of this study is the formulation of various scenarios based on two different conceptual design configurations for a sewage sludge-to-fuel pathway via HTL, co-located with a wastewater treatment...
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have