Abstract

Pore-water hypersaline conditions are common in semiarid coastlines where freshwater availability is limited. Hence, hydroperiod (or flood regime), contributes to the regular supply of new water enhancing mangrove survival and growth. The purpose of this investigation was to assess pore-water salinity and hydroperiod variability of basin mangrove distribution by installing three underground PVC (polyvinyl chloride) pipes connected to the main tidal channel. All pipes were placed perpendicular to the main channel for an annual cycle. Results indicated hydroperiod enhancement at the location of the underground pipes, compared to control stations. Overall, spring tides and rainy season played a key role in temporal hydroperiod variability. Indeed, the interior structure of the pipes allows rapid and continuous intrusion of new water into the saltpan during flood and ebb currents. After three months, pore-water salinity of 170 in the saltpan area was reduced to 80 at a distance of 2 m from the underground pipes. This study shows the applicability of underground pipes for the efficient removal of hypersaline conditions by enhancing tidal flow for possible recruitment of mangrove propagules in semiarid coastlines.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.