Abstract
Planning of 735 ft high Oroville zoned earthfill dam, proposed for construction by State of California on Feather River; summary of hydrologic and meteorologic characteristics of Feather River Basin and hydrologic studies pertaining to design floods for project; preliminary spillway design concepts and proposed operating criteria are also discussed; reservoir will impound 3,523,000 acre-ft of water.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Transactions of the American Society of Civil Engineers
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.