Abstract

The article deals with hydrogeological conditions of the groundwater resources in the western part of the Kuznetsk depression, a coal and ore mining region. On the basis of a scheme of hydrogeological boundary conditions, a numerical geologic filtration model is developed for calculation of groundwater resources in the study area. The hydrologic budget of the numerical model is evaluated for assessment of infiltration recharge of groundwater resources.

Highlights

  • Ground water in the Kuznetsk Coal Basin is of vital importance, as it is widely used for water supply of industrial and population centers, determining the economics of the location in Kemerovo region, being of paramount importance for development of coal, ore and other mineral deposits [1]

  • The research is designed to study hydrogeological conditions of operation of the potable groundwater supply, to develop a numerical model based on the report on groundwater locations, to clarify balance characteristics of the water-intake area and boundary conditions

  • In terms of geological and hydrogeological classification this area is assigned to the western margin of the Kuznetsk Basin [3,4], and the aquifer extends to the Middle Permian sediments of Ilyinsk subseries

Read more

Summary

Introduction

Ground water in the Kuznetsk Coal Basin is of vital importance, as it is widely used for water supply of industrial and population centers, determining the economics of the location in Kemerovo region, being of paramount importance for development of coal, ore and other mineral deposits [1]. Water conservation of industrial districts of the Kuznetsk Basin is one of the most topical issues. The need for drinking groundwater resources is complicated by the broad-scale development of mining industry followed by drainage of the upper hydrodynamic zone in mining operations. The research is designed to study hydrogeological conditions of operation of the potable groundwater supply, to develop a numerical model based on the report on groundwater locations, to clarify balance characteristics of the water-intake area and boundary conditions. The water balance estimate is made for wells with the total water rate of 1500 m2/day as at the end of calculation period (25 years)

Materials and methods
Hydrogeological conditions
Multi-layered aquifer system of flood plain of the Inya River
Model parameters
Conclusion

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.