Abstract

The hydrogeological, geoecological and economical risks connected with the non-confirmation of groundwater discharge, levels and quality forecast calculations while the evaluation of the reserves, have been considered. Improving the reliability of the forecasts of the potable groundwater quality changes and the corresponding reduction in the risks associated with their non-confirmation, can be achieved by carrying out the special hydrogeochemical researches of operated deposits, including isotope researches. On the basis of such studies, a comparison ofprediction calculations on the observed data of the results of the exploration and actually observed indicators of the quality of groundwater can be made, and the theoretical and methodical bases of subsoil study and forecasting can be performed.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.