Abstract

Hydrodynamic conditions in the Oosterschelde have changed as a result of the Delta Project. Engineering works were carried out between 1960 and 1970 in the northern branch of the Oosterschelde. The Grevelingen dam was built in 1964 and the Volkerak dam was completed in the spring of 1969. With the completion of these dams, the northern branch of the Oosterschelde was cut off from other estuaries, and river flow was then regulated by a sluice complex in the Volkerak dam. Between 1980 and 1987 a storm-surge barrier was constructed across the mouth of the Oosterschelde, and two compart-mentalisation dams were built in the eastern part of the basin. The storm surge barrier decreased the effective cross-sectional area at the mouth from 80 000 m2 to 17 900 m2. The compartmentalisation dams reduce the surface area of the Oosterschelde basin from 452 km2 to 351 km2. The hydraulic impact of the works is demonstrated with data from field measurements and data from model calculations.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.