Abstract

AbstractIn December, 2007, after 30 years of operations, the mine of Meirama ceased extraction of brown lignite. Since then operations have begun which will lead to the formation of a big mining lake (~2 km2 surface and up to 180 m deep) after controlled flooding of the open pit. In the process of flooding, both surface and ground waters are involved, each with their own chemical signature. According to the information available, the diversion of surface waters towards the pit hole should lead to the formation of a water body of acceptable quality. However, an unassisted flooding process could eventually form an acidic lake.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.