Abstract

This paper presents the strategy used by Hydro-Quebec TransEnergie to carry out an exhaustive electromagnetic transient study of the utility's transmission system in the Gaspe Peninsula where 1750 MW from wind generation will be integrated by 2015. This strategy consists of using the simulation tools and wind power plant models developed by the Institut de recherche d'Hydro-Quebec in the last few years to model the system and re-engineer special protection systems.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.