Abstract

AbstractThe stress concentration caused by the presence of the remaining coal pillar in the overlying goaf can easily cause large deformation of the roadway in the lower seam and other problems. To solve this problem, the reasons for stress concentration caused by the remaining coal pillar in the overlying goaf were analyzed. A hydraulic fracturing method for relieving stress concentration has been proposed. By using hydraulic fracturing technology to remove the hanging roof on both sides of the coal pillar and weaken the coal pillar system, high stress is transferred to the goaf. The degree of stress concentration in coal pillars and surrounding rock of roadway can be reduced by 47% and 26%, respectively. This method can also solve the stress concentration problem of the remaining ore pillar in the overlying goaf of the metal ore. This method has been applied in the coal mine. The deformation of the surrounding rock of the test roadway after hydraulic fracturing has been reduced by more than 60%.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.