Abstract

1. The expediency of hydraulic-fill grading of marshy coastal territories and city dumps for housing construction and recreation park and beach zones was proved practically. 2. Underwater coastal borrow pits in the shallow-water zone can be used for direct dredging of soil. 3. In the absence of sand borrow pits, fine-grained loamy sand soils can be used for hydraulic filling the construction sites. 4. To operate dredges on large water areas under conditions of violent wind-wave action, it is necessary to work out a special works organization plan taking into account the preservation of supply lines, machines, and crew during a storm and under ice conditions in the winter. 5. The possibility of using the ash of heat and power plants for engineering grading of a marshy territory for housing construction on a pile foundation was proved.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.