Abstract
Market demand of hot rolled seamless steel tube has the characteristics of multi-varieties and small batch. To meet the market demand and satisfy production requirements of seamless steel tube enterprises, this paper considers the machine maintenance factors and proposes a batch scheduling model. The model takes the machine adjustment and the idle time as optimization objective. To solve the problem, a hybrid variable neighborhood search combined with simulated annealing is designed. Experimental results show the feasibility and effectiveness of the model and algorithm.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.