Abstract

PurposeThe purpose of this paper is to present a new mathematical model for the unrelated parallel machine scheduling problem with aging effects and multi-maintenance activities.Design/methodology/approachThe authors assume that each machine may be subject to several maintenance activities over the scheduling horizon and a machine turn into its initial condition after maintenance activity and the aging effects start anew. The objective is to minimize the weighted sum of early/tardy times of jobs and maintenance costs.FindingsAs this problem is proven to be non-deterministic polynomial-time hard (NP-hard), the authors employed imperialist competitive algorithm (ICA) and genetic algorithm (GA) as solution approaches, and the parameters of the proposed algorithms are calibrated by a novel parameter tuning tool called Artificial Neural Network (ANN). The computational results clarify that GA performs better than ICA in quality of solutions and computational time.Originality/valuePredictive maintenance (PM) activities carry out the operations on machines and tools before the breakdown takes place and it helps to prevent failures before they happen.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.