Abstract

In this study, The System Advisor Model (SAM) simulation software has been used to analyze a Hybrid PV-Battery System in a residential cite in Iraq-Baghdad. The proposed system is 5kW which is affordable and applicable from the cost and required area points respectively. The monthly averaged electrical load is approximately calculated. The performance ratio for the system is 0.75 and about 6834 KWh is generated by the system per year. The results showed that the initial capital cost is 4,167.01$ which is returned after six years, LCOE Levelized cost of energy real is 7.66 ¢/kWh and Net present value is $4,649 made the system are very economical/no maintenance project and can be hooked to any the peak time load.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.