Abstract

Abstract An accurate prediction of project performance in the pre-project planning stage – especially prediction of cost performance – is paramount to project stakeholders. The aim of this study is to propose and validate a hybrid predictive model for cost performance of commercial building projects using 64 variables related to the levels of definition in the pre-project planning stage. The proposed model integrates a support vector regression (SVR) model with principal component analysis (PCA). The proposed method was analyzed and validated based on 84 sets of data from an equal number of commercial building projects. Additionally, the result obtained using the proposed PCA–SVR model was compared with four other data-mining techniques. Experimental results revealed that the proposed PCA–SVR model is able to predict with high accuracy the cost performance of commercial building projects in the pre-project planning stage and is more efficient than the other four models.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.