Abstract
In this paper, a hybrid integer programming model is proposed for flexible job-shop scheduling problem(FJSP). Using crossover operator and mutation operator, the hybrid particle swarm optimization(HPSO) algorithm with basic particle swarm optimization(BPSO) algorithm and genetic algorithm(GA) is employed to solve this problem. Compared with BPSO algorithm, HPSO algorithm has a potential to reach a better optimum. The simulation software for FJSP using HPSO algorithm is designed and implemented based on Object-oriented Programming Language, and the results of simulation indicate that, HPSO algorithm outperforms BPSO algorithm on searching speed for global optimum and avoiding prematurity in solving FJSP.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.