Abstract

AbstractDespite many research efforts that have focused on the multimode resource-constrained project scheduling problem (MRCPSP), very little success has been achieved in solving the problem for large-scale projects. In this paper a new hybrid optimization method is presented to achieve an advancement in optimal planning and scheduling of large-scale construction projects with multiple duration/resource execution modes and resource constraints. The proposed method consists of a novel heuristic and unique genetic optimization algorithm. The heuristic is designed to achieve schedules with efficient resource utilizations through dynamic selection of modes. A genetic optimization algorithm is integrated to the proposed optimization method to further improve the quality of the solutions obtained in the heuristic phase. The computational experiment results reveal that the new hybrid method outperforms the state-of-the-art methods and achieves high-quality solutions in significantly less computation time, espec...

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.