Abstract

Upstream oil production using dual string completion, i.e., two tubing inside a well casing, is common due to its cost advantage. High pressure gas is employed to lift the oil to the surface when there is insufficient reservoir energy to overcome the liquids static head in the tubing. However, gas lifting for this type of completion can be complicated. This is due to the operating condition where total gas is injected into the common annulus and then allowed to be distributed among the two strings without any surface control. High uncertainties often result from the methods used to determine the split factor—the ratio between the gas lift rate to one string over the total gas injected. A hybrid model which combined three platforms: the Visual Basics for Application programme, PROSPER (a nodal analysis tool) and Excel spreadsheet, is proposed for the estimation of the split factor. The model takes into consideration two important parameters, i.e., the lift gas pressure gradient along the annulus and the multiphase pressure drop inside the tubing to estimate the gas lift rate to the individual string and subsequently the split factor. The proposed model is able to predict the split factor to within 2% to 7% accuracy from the field measured data. Accurate knowledge of the amount of gas injected into each string leads to a more efficient use of lift gas, improving the energy efficiency of the oil productions facilities and contributing toward the sustainability of fossil fuel.

Highlights

  • Gas lift is one of the common artificial lift techniques used in upstream oil production

  • The objective of this study is to develop a hybrid model to determine the gas lift split factor considering the fluids flow phenomena both in the annulus and the tubing

  • The number oflast sections is deemed sufficient is vertical in the top sections, and the deviation is only observed in the two sections

Read more

Summary

Introduction

Gas lift is one of the common artificial lift techniques used in upstream oil production. It works by injecting high pressure gas into the annulus and tubing, reducing the fluids density and allowing the fluids to be produced to the surface at a lower bottom-hole pressure. Dual string completion refers to a single well casing housing two tubing, see Figure 1. The tubings are fitted into the casing side by side with all of the required accessories. The tubing will be of a different length, with one shorter than the other, to allow production from different zones.

Objectives
Results
Conclusion
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.