Abstract

Minimising earliness and tardiness penalties as well as maximum completion time (makespan) simultaneously on unrelated parallel machines is tackled in this research. Jobs are sequence-dependent set-up times and due dates are distinct. Since the machines are unrelated, jobs processing time/cost on different machines may vary, i.e. each job could be processed at different processing times with regard to other machines. A mathematical model which minimises the mentioned objective is proposed which is solved optimally via lingo in small-sized cases. An intelligent water drop (IWD) algorithm, as a new swarm-based nature-inspired optimisation one, is also adopted to solve this multi-criteria problem. The IDW algorithm is inspired from natural rivers. A set of good paths among plenty of possible paths could be found via a natural river in its ways from the starting place (source) to the destination which results in eventually finding a very good path to their destination. A comprehensive computational and statistical analysis is conducted to analyse the algorithms’ performances. Experimental results reveal that the proposed hybrid IWD algorithm is a trustable and proficient one in finding very good solutions, since it is already proved that the IWD algorithm has the property of the convergence in value.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call