Abstract

One of the common assumptions in the field of scheduling is that machines are always available in the planning horizon. This may not be true in realistic problems since machines might be busy processing some jobs left from previous production horizon, breakdowns or preventive maintenance activities. Another common assumption is the consideration of setup times as a part of processing times, while in some industries, such as printed circuit board and automobile manufacturing, not only setups are an important factor but also setup magnitude of a job depends on its immediately preceding job on the same machine, known as sequence-dependent setup times. In this paper, we consider hybrid flexible flowshops with sequence-dependent setup times and machine availability constraints caused by preventive maintenance. The optimization criterion is the minimization of makespan. Since this problem is NP-hard in the strong sense, we propose three heuristics, based on SPT, LPT and Johnson rule and two metaheuristics based on genetic algorithm and simulated annealing. Computational experiments are performed to evaluate the efficiencies of the algorithms.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.