Abstract

This paper attempts to substitute Resource Leveling Problem (RLP) into multi-project environment and construct Resource Leveling Problem of Multi-project (RLPMP) model with the goal of minimizing the sum of weighted mean square deviations of multi-resource requirements. A two-stage hybrid differential evolution particle swarm optimization algorithm is used to solve the model. In the first stage, differential evolution algorithm is used to produce new individuals, and in the second stage, particle swarm optimization algorithm uses a new speed update formula. In the first stage, in order to ensure that the optimal individual will not be destroyed by crossover and mutation, and to maintain the convergence of differential evolution algorithm, we try to introduce Elitist reservation (ER) strategy into differential evolution algorithm. In the second stage, we use a kind of Particle Swarm Optimization (PSO) algorithm with dynamic inertia weight. Through the dynamic change of inertia weight, the global search and local search ability of the algorithm can be adjusted flexibly. The case verification shows that the hybrid differential evolution particle swarm optimization algorithm can effectively solve the RLPMP model, and then effectively improve the balance of multi-project resources.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.