Abstract

The resource constrained project scheduling problem with a flexible project structure and consumption and production of resources, involves making a selection of activities and scheduling these activities in order to minimize the makespan, subject to precedence and resource constraints. Since finding a feasible selection of activities is NP-hard, we introduce the concept of group graphs and restrict ourselves to instances with an acyclic group graph. For these instances, which represent many practical cases, we show how to make a feasible selection of activities in polynomial time and use this concept to schedule the selected activities using a hybrid differential evolution algorithm. We compare this algorithm with an algorithm from the literature on special cases of instances without consumption and production of resources, and show that our algorithm creates solutions of higher quality. Furthermore, to compare general instances, we develop an ant colony optimization algorithm that performs slightly better on special cases than the algorithm from literature and show that the hybrid differential evolution algorithm outperforms the ant colony optimization algorithm on general instances.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call