Abstract

The stochastic behavior of PV together with high PV penetration have given rise to power quality concerns involving voltage dynamic issues such as undervoltage, overvoltage, sag and swell. To ensure the grid’s stability, various methods have been practiced such as a proper sizing of the grid lines and the installation of power quality compensation equipment. However, these measures often require high costs and high control complexity due to additional equipment being involved such as multiple transformers and inverters. Moreover, the current available reactive power compensation equipment has a lesser impact on distribution level networks. Therefore, this work proposes a hybrid control of grid-feeding mode and energy storage with Direct Current (DC) fault detection scheme utilizing fuzzy control to mitigate high PV penetration problems, PV intermittency and faults via active power compensation to maintain the system’s voltage within its nominal range. This hybrid control works on two mode of operations: strategic power dispatch by the grid-feeding mode to solve under and overvoltage caused by inconsistent PV generation. Meanwhile, the utilization of fuzzy control aims to solve PV intermittency and line faults. The novel hybrid control has proven its capability to solve voltage dynamic problems caused by high PV penetration, intermittency and faults in the network within a shorter timeframe.

Highlights

  • In recent years, PV system deployments in the grid system have increased significantly, with yearly installed capacities of around 100 GWp [1]

  • The proposed hybrid control of grid feeding mode (VOC) and energy storage with fuzzy logic control has proven its capability to mitigate the stated voltage dynamic issues: undervoltage, voltage sag and fluctuation caused by high PV penetration, fault and PV intermittency via active power compensation to maintain the system’s voltage within its nominal range

  • The developed Grid-Feeding mode with Voltage Oriented Control (VOC) is able to solve the undervoltage problem, whereas the designed Fuzzy Logic (FL) control is capable of solving fault and PV intermittency issues in the grid-interconnected PV-RES

Read more

Summary

Introduction

PV system deployments in the grid system have increased significantly, with yearly installed capacities of around 100 GWp [1]. According to the estimation by the International Renewable Energy Agency (IRENA), the cumulative installed capacity would escalate to up to 2840 GW by 2030 and 8519 GW by 2050 [2]. The new government under the Ministry of Energy, Science, Technology, Environment and Climate Change (MESTECC) set a new target for renewable energy (RE) of 20% for 2025 excluding large hydro in the power mix [4]. With the available climate advantages in Malaysia, this would make PV-RES (PV-renewable energy sources) one of the leading forms of renewable generation in Malaysia aside from biomass and mini-hydro energy. The implementation of high capacity LSS to fulfil load demand will give rise to power quality issues such as under and overvoltage due to high PV penetration if left unattended

Objectives
Methods
Findings
Discussion
Conclusion
Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call