Abstract

AbstractA new approach to solving production management problems in the supply net is proposed. An expert system designed to help companies in medium‐term and short‐term production planning is discussed. The proposed expert system considers alternative process plans for a job and outsourcing, when a bottleneck exists in the machine. The proposed hybrid system uses the output of the expert system as the input of the genetic algorithm. The output of the genetic algorithm is a near optimal schedule. The proposed method does not require any unrealistic assumptions. It can be used to solve highly complicated and non‐linear functions of a realistic problem. Copyright © 2007 John Wiley & Sons, Ltd.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.