Abstract
The purpose of this paper is to provide a method that can be used to solve potential lawsuit problems caused by change orders in construction projects. A hybrid Artificial Intelligence (AI) model, the Hybrid ANN-CBR Model (HACM), is developed utilizing the AI branches of Artificial Neural Networks (ANN) and Case Based Reasoning (CBR). The research is based on the litigation archives collected by the Supreme Courts and appellate courts in 48 states and one district of the USA. The accuracy of the HACM prediction rate reaches 84.61%, not only for predicting litigation likelihood by using the ANN approach but also utilizing the CBR approach to yield warnings and display litigation information related to past cases. After evaluating 31 cases it is confirmed that the model HACM performs well especially for those medium sized construction projects. It can be concluded that it is feasible to link ANN and CBR together to provide a tool with a relatively high rate of prediction accuracy and a conceptual model to solve potential severe disputes cased by change orders.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.