Abstract

The sheath current generates on metal sheath of underground cable, and it causes cable faults, electroshock risk and reducing of cable performance in high voltage underground cable line. Therefore, the sheath current must be reduced, and if the sheath current can be determined before high voltage underground line is installed, the required precautions can be taken to reduce the sheath current. Hence, cable faults and electroshock risk are prevented, and cable performance increases. In this study, simulations of high voltage underground cable line are made in PSCAD/EMTDC, and the sheath current is forecasted by using hybrid artificial neural network (ANN) method. Differential evolution algorithm (DEA) and particle swarm optimization (PSO) are used to generate hybrid ANN method. The results of hybrid ANN method are better than classic ANN, and the results of DEA-ANN method are better than PSO-ANN. Also DEA-ANN can be used in forecasting studies.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.