Abstract
AbstractThis article shows, based on the Haitian crises after 2010, that international organisations (IOs) as central actors of humanitarian governance in complex crises situations rely on sequenced time frames to manage the diversification and massification of relief actors. At the same time, crisis professionals struggle to correlate their lived temporalities with this preconstructed time model when the localised crisis shifts from an event to a permanent temporality. The article is, therefore, guided by the following question: How is time strategically used by IOs in humanitarian governance and what are the effects of conflicting localised temporalities? The article argues first that different types of temporalities were associated with different groups of aid actors after the 2010 earthquake. The prolongated humanitarian crisis resulted in the repetitive adaption of UN appeal and funding instruments. Second, I show that the UN used planning instruments based on the disaster management cycle. Based on its cyclical temporality, UN actors combined it with humanitarian project management tools to govern aid projects by formalising the negotiation between the long‐term aid programmes and the short‐term duration of projects. I finally show the synthesis of both forms of temporal aid governance to control the contradictions between localised and funding temporalities.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.