Abstract

Various human factors issues have been raised in recent years concerning the operability of nuclear power plant control rooms. The plethora of status indicator lights which must be monitored effectively has prompted the development of alternative control board design layouts to increase ease of operation. A study was conducted to address the feasibility of implementing the “green board” concept in a nuclear power plant control room which has an existing “red/green” board. The research included a comparison of current control room display and design concepts as well as an identification of the impact that the “green board” modification could have upon various aspects of daily plant operation. Recommendations based on the information gathered during the study specify that existing control rooms should be modified to incorporate the “green board” concept for more effective operation. In addition, a recommendation was made that further research should be conducted to investigate the following parameters: (1) detection time, (2) the effects of stress, training and different approaches to computerizing status indicators on operability; and (3) CRT color-coding compatability during off-normal operation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.